Sign In | Join Free | My burrillandco.com
Home > Choke Kill Manifold >

Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

Hebei E-valves Petroleum Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Remote Control Well Testing Choke Manifold Drilling API SpEC 16C from wholesalers
     
    Buy cheap Remote Control Well Testing Choke Manifold Drilling API SpEC 16C from wholesalers
    • Buy cheap Remote Control Well Testing Choke Manifold Drilling API SpEC 16C from wholesalers

    Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

    Ask Lasest Price
    Brand Name : Hebei Pantu
    Model Number : YG140
    Certification : API 16C
    Price : USD 50000-100000 per set
    Payment Terms : T/T
    Supply Ability : 5 sets per 3 months
    Delivery Time : 7 work days
    • Product Details
    • Company Profile

    Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

    4 1/16 Inch 20000psi Choke Manifold Drilling API SpEC 16C


    Choke Manifold Drilling Working principle


    When the pressure rises in well, fluid in the well can be released in the utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through the gate valve as the casing pressure is quite high.


    Choke Manifold Drilling Parameter


    TypeWorking pressureMain bore diaBy-pass dia.Remarks
    (psi)On.)(In.)
    YG140200004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 1/16" 2 9/16"Different types of combinations can be provided according to requirements
    YG105150004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 9/16" 2 1/16"
    YG70100004 1/16" 3 1/16" 2 9/16" 2 1/16"4 1/16" 3 1/16" 2 9/16" 2 1/16"
    YG3550004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"
    YG2130004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"

    Configuration


    The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.


    Operating Instructions


    (1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
    (2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
    (3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
    (4) The pressure gauge must be installed.
    (5) In winter, the choke manifold can work under a low-temperature conditions.


    Quality Remote Control Well Testing Choke Manifold Drilling API SpEC 16C for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hebei E-valves Petroleum Equipment Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)